Emergency Scenario 1: Worker Injury

Description: A worker falls from scaffolding and is seriously injured. Emergency Plan:

  1. Immediate Action:
  2. Containment Measures:
  3. Investigation:
  4. Long-term Actions:

Emergency Scenario 2: Fire Breakout

Description: A fire breaks out due to an electrical fault in temporary site wiring. Emergency Plan:

  1. Immediate Action:
  2. Containment Measures:
  3. Investigation:
  4. Long-term Actions:

Emergency Scenario 3: Chemical Spill

Description: Hazardous chemicals are accidentally spilled during transport within the site. Emergency Plan:

  1. Immediate Action:
  2. Containment Measures:
  3. Investigation:
  4. Long-term Actions:

Emergency Scenario 4: Severe Weather Event

Description: A sudden severe storm threatens the structural integrity of the construction site. Emergency Plan: